Exterior Painting in Palm City, FL
Exterior painting in Palm City means contending with Treasure Coast heat, seasonal salt air off the St. Lucie River, and HOA color approval processes that can delay a project if the paperwork isn't in order — KB Painting & Refinishing handles all of it. Our painters and project managers bring 25+ years of combined experience repainting CBS and stucco homes across Martin County with Sherwin-Williams coatings formulated for Florida's punishing climate.
Local insight
Harbour Ridge Yacht & Country Club and Pipers Landing both enforce strict exterior color palettes; we provide written estimates with color-chip documentation your HOA reviewer needs, and we know which Sherwin-Williams lines hold up longest on stucco soffits and fascia exposed to tidal humidity.
Exterior painting for Palm City’s CBS and stucco homes
The homes in Palm City’s gated enclaves — Harbour Ridge, Pipers Landing, and Crane Creek Estates — sit on large lots with significant exterior surface area. That means more linear feet of trim, more stucco body, and more exposure to afternoon thunderstorms and post-storm humidity than a typical subdivision home. Our crews pressure-wash, patch and caulk stucco cracks, prime bare spots, and apply two full coats before calling a job done.
Why exterior repaints fail in Palm City and how we prevent it
The leading causes of premature exterior paint failure on Treasure Coast homes are skipped primer, insufficient surface prep on stucco, and paint applied during high-humidity windows. We schedule exterior work for appropriate conditions, use elastomeric primer on stucco where movement cracking is a factor, and finish with Sherwin-Williams Emerald Exterior or Duration — both rated for Florida’s UV and humidity exposure.
Our process and warranty
Every exterior project starts with a written, itemized estimate. We power-wash the surface, repair caulk joints, spot-prime, and apply two topcoats. Our 5-year workmanship warranty covers adhesion failures and peeling attributable to our application.
Questions Palm City homeowners ask
My HOA requires color approval before I start. Can you help with that process? Absolutely. We provide a detailed written estimate and can supply Sherwin-Williams fan decks with the specific chip numbers your association’s architectural committee needs. We’ve worked with multiple Palm City HOAs and know what documentation they typically require.
How do I know when my Palm City home’s exterior actually needs repainting versus just cleaning? A good pressure wash can restore a faded exterior a few years, but chalking, cracking, or peeling are signs the paint film has failed and cleaning won’t fix it. We’ll assess this honestly at the free estimate — if washing is all you need, we’ll say so.
Exterior Painting — before & after
What Palm City neighbors say
Get a free estimate in Palm City
Call (772) 222-3227 or fill out the form. No pressure, line-item quote the same day.
Common questions
How long will an exterior paint job last on a stucco or CBS home in South Florida?
With proper surface prep and a quality elastomeric or acrylic coating, most stucco and CBS exteriors in South Florida last 7–10 years before needing a full repaint. Homes closer to the coast or with significant sun exposure on west-facing walls may need attention sooner. Our 5-year workmanship warranty covers peeling, cracking, and adhesion failures — not just the first season.
What goes into your price for an exterior paint job?
The biggest variables are square footage, surface condition, and the number of coats required. Heavily chalked, peeling, or mildewed surfaces need more prep work, which adds time and cost. We'll note all of that in your written estimate so there are no surprises. We use Sherwin-Williams products — primarily Emerald Exterior and Loxon elastomeric lines — and we don't cut corners by skipping primer on bare or patched areas.
Do you handle HOA color approvals before you start?
We can help. Once we agree on color selections, we'll provide the product specs and paint chip documentation your HOA needs for approval. We recommend getting approval in writing before we schedule the start date so nothing delays your project.